 |
| Carl Ben Eilsen School |
|
|
For this project in Fargo, ND, architect Tim Zerr, Zerr-Berg Architects, selected Metecno-Morin's BR-28 and C-29 profiles to add color and texture variety to the project . The BR-28, is a Box Rib type of exposed fastener panel with 1 1/2 inch deep ribs repeating every 7 inches on center. Because of the asymetrical profile of the Box Rib panel, that semi-conceals the exposed fastener in the recess, for a more sophisticated look. The C-29 x 7/8 is a corrugated panel with 7/8 inch high rib crests on 2.67 inch centers. The 7/8" deep rib gives a bolder read to the panel as compared to the more commony found 1/2" deep corrugated panels.
Architect: Zerr-Berg, Fargo, ND Installing Specialty Contractor: Pierce Roofing and Sheet Metal, Fargo, ND
|
|
|
|
|
 |
| New Shakopee High School |
|
| This project, designed by Wold Architects and Engineers was built in 2006. The architect selected Morin's F-12, 1 1/2" deep x 12" flush face, concealed fastener panels for the 4' high fascia that predominates on the design elsewhere on the project. More apparent are the horizontal Y-36 panels from Morin on the high clerstory areas and penthouse areas, along with the flush F-12 panels and vertical fins for accent. Integral panel/louver openings were used as a design feature, too.
Custom architectural panels were applied on the entry fascia and were also used to wrap massive beams, fascias and soffits of the entry vestibule. They were also used above the display cases in the commons area near the core of the building.
Architect: Wold Architects and Engineers, St. Paul, MN General Contractor: Stahl Construction, Minneapolis, MN
|
|
|
|
|
 |
| 9th Grade Center, West Fargo, ND |
|
| This is the 9th Grade Center for the West Fargo, ND School District. For this project we furnished and installed 11,000 sf of Metecno-Morin's XA-16 profile concealed fastener panel from their Integrity Series. The material was 18 gauge steel with a Kynar-500 finish in a silver metallic color with a clear top-coat.
The metal roofing was Metecno-Morin's SCR-16 profile, installed by others. Finish and gauge was the same as the wall panels.
Architect: YHR Partners, Moorhead, MN General Contractor: Meineke-Johnson, Fargo, ND
|
|
|
|
|